|
|
 Select Projects from Goodwin Bros. Construction Co.
PROJECTS
 | | MSD Lower Meramec Wastewater Treatment Plant - St. Louis, Missouri The new plant is sized for an average daily wastewater flow rate of 15 million gallons per day with 60 million gallons per day peak daily wastewater flow rate. Treatment at the plant will include primary and secondary processes. The treatment process will include fine screening of the wastewater as it flows into the plant's circular primary clarifiers along with grit removal from the primary sludge. Secondary treatment will be achieved using covered trickling filters and circular secondary clarifiers. Sludge created by these facilities will be dewatered in a multi-level process building using belt filter presses and then loaded into trucks for transporting to a proper disposal site. A single level administration/maintenance building will be used to operate and maintain the plant.
... [Read More] |
 | | Highway 61/67 Meramec River Bridge - Arnold, Missouri [Read More] |
 | | Kimmswick Wastewater Treatment Plant - Kimmswick, Missouri [Read More] |
 | | Jefferson County Water Treatment Plant - Herculaneum, Missouri [Read More] |
 | | Fee Fee Creek Bridge - Maryland Heights, Missouri [Read More] |
 | | West County Community Church - Wildwood, Missouri [Read More] |
 | | Ste. Genvieve Pump Station & Closure Structure - Ste. Genevieve, Missouri [Read More] |
 | | Jefferson City Wastewater Treatment Plant - Jefferson City, Missouri [Read More] |
 | | Coldwater Treatment Plant Improvements - Florissant, Missouri The construction of a new Headworks Building, including pumping and screening equipment, four new primary clarifiers, a Sludge and Grit Pump Station, flow splitting facilities, a new Blower Building, modifications to the existing aeration basins, a new final clarifier, a new sludge thickener, a new Maintenance Building, carbon absorption odor control system, building demolition, new site grading and piping, electrical and HVAC upgrades, plant controls system, and miscellaneous other plant improvements. ... [Read More] |
 | | Wentzville Water Reclamation Expansion - Wentzville, Missouri The project generally consists of wastewater treatment plant improvements, including: New Headworks, New Treatment Process Unit, Modifications to Existing Flow Metering, New Blower Building, New Effluent Metering Structure, New UV Disinfection/Post-Aeration Structure, New UV Building, New Sludge Holding Tank, New Site Roadway, Existing Electrical System Modifications, Existing Instrumentation System Modifications, Yard Piping and Site Work... [Read More] |
 | | Buzzi Unicem USA - River 7000 Civil Project - Festus, Missouri [Read More] |
 | | Missouri River Wastewater Treatment Plant Headwork Improvements - Maryland Heights, Missouri Construction of an Influent Structure, Screen Building, Grit Chambers, Grit and Blower Building, Preaeration Basins, Peak Flow Storage Basins, Return Flow Pump Station, Washwater Pump Station, Odor Control System, replacement of pumps at the Effluent Pump Station, abandonment of the North Lagoon, site work and utilities and miscellaneous other plant improvements. The Contract also includes demolition of the Inlet/Screen Structure, Inlet Channels, Grit Removal Structure, Grit Building Nos. 1 and 2, Preaeration Channels, Maintenance Building, Storage Building, Hydrogen Peroxide Feed Building and Gas Storage Sphere.... [Read More] |
Construction Website Design By IQComputing.com
|
|