Ste. Genevieve Pump Station & Levee

After the 1993 flood devastation in Ste. Genevieve, the Corps of Engineers selected Goodwin Brothers Construction Company to construct a pump station, railroad closure structure and a portion of the levee work which was all a part of the Ste. Genevieve Urban Design Levee project.

Details include:
• One of the largest submersible pump stations in North America
• 30-foot deep mass excavation work within 600 feet of the Mississippi River
• Mass concrete walls over 12-feet thick
• Large mass excavations of over 250,000 cubic yards
• Cast iron sluice gates measuring 12 feet x 16 feet
• Relocation of more than 2,000 feet of waterway channel
• 50,000 tons of rip-rap channel lining
• 10,000 yards of cast-in-place concrete